Skip to contentSkip the AI assistant

Brief us.

A room, a floor, a building. Your closest studio replies.

Open the full brief — studios, scope, timeline.

Live

← lab · response and instruments

Six instruments, one plane.

Kinetic partitions. Projection surfaces. Sound masking. The two copilots that write the brief and the signage schedule. And one media wall, five modes. Same control plane, six registers of the room.


walls that move

Walls that move. Rooms that breathe.

Nine in the morning: four rooms. Two in the afternoon: one room. Six in the evening: no walls. Same floor plate.

loop · six seconds
steplive · interactive

Send this scenario — or step through below

MORNING · OPEN PLAN

Both partitions retracted. One large floor.

One · Three positions

Partition. Facade. Furniture.

Operable partitions

The training room that becomes the town hall.

Motorized acoustic partitions — STC fifty-plus when closed, gallery-open when stowed. Schedule-driven via the room controller; one button in the morning brief turns four twelve-person rooms into one sixty-person all-hands by ten in the morning.

Stack: Skyfold / Modernfold + room controller

Kinetic facades

The skin that responds to the sun.

Motorized shading systems tied to solar tracking + occupancy. South face goes opaque at half past two in the afternoon; west face stays clear because the floor’s empty. HVAC load drops, glare disappears, no occupant ever sees the moment it shifts.

Stack: Lutron / WindowMaster + ZYETA.i orchestration

Reconfigurable furniture

The pod that becomes the huddle.

Mobile partitions, height-adjustable tables, modular soft seating on casters. Lower-tech than the others — and the most-used. The workplace team rearranges in ninety seconds between sessions; the floor plate map updates automatically via the location tag on each piece.

Stack: BTOD / Steelcase + Bluetooth tags

Peel back the stack

Two · The stack

Mechanical layer
Motorized tracks, drive systems, acoustic seals. Engineered for three to five cycles per day over ten-plus years — domestic-grade partitions don’t survive workplace cadence. Specified during base-build to coordinate with floor slab loads and ceiling void depth.
Control layer
Room controllers (Crestron / Q-SYS) handle the local fail-safe. Movement is gated by occupancy sensors and door-state — partition won’t move while a person is in the seal path. Manual override always available at the wall.
Schedule layer
Calendar integration (Exchange / Google) drives the morning reconfigure. If the all-hands moves from ten to eleven in the morning, the partition shifts with it. No workplace coordinator manually resetting at five to ten.
Orchestration
ZYETA.i reads occupancy, calendar, and weather — and tells each subsystem when to act. Single dashboard for workplace ops; per-room manual control for the people in the room. Both layers stay sane when the network blinks.

Three · The case

A floor is a schedule, not a slab.

The standard workplace gets the area count right and the temporal model wrong. Twelve meeting rooms at sixty percent utilization at peak is eight rooms most of the day plus four rooms once a week. Kinetic architecture inverts that: size to peak with one set of walls, then collapse to fit the rest of the time.

Effective area

A six-hundred-sqm floor with two operable partitions yields the convening capacity of eight hundred to nine hundred sqm of fixed-wall layout.

Cycles/day

Three to five reconfigure cycles per workday. Motorized tracks engineered for a ten-plus year duty life.

Time saved

Four to six hours a week of workplace-ops labour recovered — the morning reset used to be manual.

  • Partitions: STC fifty-plus · Skyfold/Modernfold · one button
  • Facades: solar-tracked · Lutron/WindowMaster · unseen shift
  • Furniture: mobile · tagged · location updates the floor plate
  • Stack: motorized tracks · Crestron/Q-SYS · calendar drives it · ZYETA.i orchestrates
  • Decided at base-build — changes the slab, the ceiling void, the cable routes.

Tech-AV · orchestrated.