Skip to contentSkip the AI assistant

Brief us.

A room, a floor, a building. Your closest studio replies.

Open the full brief — studios, scope, timeline.

An open workplace floor in daylight, people walking between lounge zones and glass meeting rooms

Work /Bengaluru · Our layer on a Zyeta build · Picture is a visualisation

Perpetual beta — a floor with no assigned desks.

A GCC floor instrumented so the building responds to where people actually are, not a schedule.

Client
Global financial services firm
Category
Workplace

The design process doesn't end at handover. It shifts from architectural to operational.

A mix of dedicated desks, alternative seats and shared work points, with more people than desks and more work modes than the plan accounted for. The usual fix — cut desks, add hotelling software — just moves the friction from no desk to no right space for the work.

The base build came from the parent practice; our layer instruments the floor so the building responds to measured occupancy instead of a timer. RFID smart lockers remove the anchor of my desk, occupancy sensing gives facilities live utilisation, and daylight harvesting plus CO₂-indexed ventilation track real conditions — all feeding the building management system so lighting, HVAC and maintenance shift to condition-led operation.

Flexible seating went in without the peak-hour contention that usually follows removing assigned desks — the lockers carried the behavioural change, and facilities now have a real occupancy record to plan against.

Build the next one.

Brief us