Skip to contentSkip the AI assistant

Brief us.

A room, a floor, a building. Your closest studio replies.

Open the full brief — studios, scope, timeline.

Still of: A workplace lobby at golden hour, staff crossing in silhouette past a full-height amber light wall, the city pale beyond the glass

Operate

Handover isn't the finish.

Long after handover, the floor should still do what it was measured to do. So we run it: content, CMS, telemetry, tuning.

What the retainer covers

The wall long after demo day matters more than the wall on demo day.

Day one gets the tour. The operating contract keeps the floor honest long after — content refreshed, rooms serviced, the reading still taken.

What the retainer covers.

  • Keep the rooms working. AV audits, upgrades and telepresence health — the room still works long after the tour.
  • Keep the walls current. Content produced, scheduled and refreshed, so the surface never goes stale.
  • Keep the floor learning. Telemetry run, the plan revisited, the floor read again.

Measured, not promised.

These are the measures a retainer is run against, not guarantees. Any figure we publish is quoted from that deployment's own before-and-after — never an anonymous campus average.

The telemetry that runs the retainer runs in the lab.

Drive the floor instrument yourself — the same model a retainer reports from.

Drive the floor in the lab

Start with one floor.

The operating contract is how the floor keeps earning the commute.

Start the conversation