Skip to contentSkip the AI assistant

Brief us.

A room, a floor, a building. Your closest studio replies.

Open the full brief — studios, scope, timeline.

← Insights

The carbon line your fit-out brief is missing.

The sustainability section of a corporate fit-out brief is usually about operational carbon: LED retrofit, efficient chillers, occupancy sensors, a green-building target. Real numbers, measured, owned by facilities. What’s missing is the line above it — embodied carbon, baked into the carpet, partitions, ceiling grid, and workstations before a single light switch gets flipped. Nobody owns that line, so nobody briefs against it.

What a pre-material-selection audit does

Well before the procurement freeze, a short engagement can inventory the proposed spec against published embodied-carbon factors, identify which line items carry the most weight — usually flooring, partitions, workstations — and surface low-carbon substitutes, including reused stock (see the piece on reuse audits). The output is one page: a baseline, substitution options, a procurement comparison.

The procurement argument

Reused furniture and fixtures — workstations from a closed-out tenant on the same campus, a partition system already on its second install — cut embodied carbon on the affected lines and skip the manufacturing markup and freight. The friction is logistical, not financial: it needs a window between lease signing and design freeze, and it needs procurement to talk to the outgoing tenant.

What this is not

It’s not a certification-point chase — green-building credits reward certifying, not measuring; this audit is the upstream instrument that makes a life-cycle assessment answerable later. It’s not a substitute for operational carbon planning, either — HVAC and lighting still need their own numbers. Embodied is the other axis.

The operator take

A fit-out brief with a budget target but no embodied-carbon target is a sustainability programme without a scoreboard. Add the line, run the audit before procurement locks.

Want to run an audit on an incoming fit-out? Talk to the studio.

Bring a real floor to the studio.

Brief us